Contact Us
  • Address Varyap Plaza Kat.1 No.172 (Esenyalı Mh. Uygar Sk & Barış Sk. No:61 34903 Pendik / İstanbul)
  • E-mail info@alkoncelik.com
Follow Us
Contact Us +90 216 652 10 07

Curious About

What Are You Curious About Our Structures?

QUESTION: What is a light gauge steel (LGS) and prefabricated building?
ANSWER: They are ready-made structures where all wall carcass, insulation and covering materials are prepared in the factory environment, transported to the site where they will be assembled. Light steel profiles are used as the main carrier system, materials that are resistant to natural conditions on exterior and interior facades, and insulation materials with high insulation value are used.

QUESTION: How are the light gauge steel (LGS) or prefabricated building construction processes?
ANSWER: The light gauge steel (LGS) and prefabricated building plan are prepared in line with the demands of our customers, the climatic conditions of the region where it will be installed and the materials to be used according to the choice of our customers are determined. The prepared plan and technical details are clarified and a contract is made. Production is completed in the process specified in the contract, the building is shipped, assembly is done by our professional teams.

QUESTION: Who gets the license for light gauge steel (LGS) or prefabricated buildings?
ANSWER: Our customers obtain the licenses for light gauge steel (LGS) buildings. For the license, an engineering office (architectural project, electrical project, plumbing project, mechanical plan) is prepared in the region where the building will be established, and the legal permit application is made by your architect.

QUESTION: How many floors can light gauge steel (LGS) buildings or prefabricated buildings be built?
ANSWER: It is usually built with one, two or three floors. Even 4 floors are available. Special optional floor requests are evaluated.

QUESTION: Can our projects convert to light gauge steel (LGS) or prefabricated type buildings?
ANSWER: Since light gauge steel (LGS) buildings consist of carcassed wall modules, we can work close to your projects. It is similar for prefabricated buildings.

QUESTION: Are light gauge steel (LGS) houses or prefabricated built only for summer house or second house purposes?
ANSWER: Light gauge steel (LGS) buildings are alternative to concrete buildings. Since the production of light gauge steel (LGS) houses is made considering the regional climatic conditions, you can easily use them in 4 seasons. Prefabricated buildings can be used all year too.

QUESTION: Can tile ceramic applications be applied to the walls of light gauge steel (LGS) or prefabricated buildings?
ANSWER: It can be done. The only thing that needs to be considered is that adhesives with elastic properties should be used.

QUESTION: Painting etc. on the walls. can it be hung?
ANSWER: You can hang tables by screwing on the walls, but heavy accessories should be screwed to the carrier profiles. 

QUESTION: Can we do the painting process ourselves in light gauge steel (LGS) or prefabricated buildings?
ANSWER: We do not recommend it at the first painting for light gauge steel (LGS) buildings or prefabricated buildings as the joint elements or outer covering joints are siliconized before the painting process.

QUESTION: How can we find out the technical properties of the materials you use?
ANSWER: You can get detailed information from our website or by contacting our office.

QUESTION: What is included in the prices given for light gauge steel (LGS) or prefabricated buildings?
ANSWER: Light gauge steel (LGS) structures or prefabricated building structures are delivered to advanced rough. Light gauge steel (LGS) building's wall carcasses, wall coverings, insulation, connection elements, ceiling, ceiling insulation and roofing material, supply of exterior and interior doors, windows, transoms and glasses, interior and exterior paint, electrical and water installation in the building, installing lamps, sockets, vitrified the supply of fixtures are included.
Note: Since the tile and ceramic processes in light gauge steel (LGS) or prefabricated buildings belong to the buyer, the installation of sanitary ware is done by the buyer.

QUESTION: What should the customer do in light gauge steel (LGS) or prefabricated buildings?
ANSWER: Making the ground concrete and all kinds of excavation, landscaping, floor and wall coverings (screed, ceramic, tile, etc.), light gauge steel (LGS) or prefabricated  building external connections (electricity, waste water, clean water), permits and license procedures to be obtained from the municipality, heating and cooling installations (such as radiators, air conditioners etc.), accommodation and catering costs of our assembly team in installations outside of Istanbul in Turkey, transportation and transportation insurance of the materials belong to our customer.
Note: Assembly out of Turkey is not included in scope. If needed, supervisor can be send to the site. In this case visa, return plane tickets, transfer two directions between airport and site, accommodation, catering, security and health service of supervisor’s will be under responsibility of customer.

QUESTION: Can light gauge steel (LGS) or prefabricated buildings produce different insulation solutions for cold regions?
ANSWER: Insulating materials on the outer walls can change and the wall thickness is increased when necessary. Sheathing application can also be made to the exterior if requested.

QUESTION: What is the approximate usage period of light gauge steel (LGS) or prefabricated buildings?
ANSWER: Therefore the life of the materials used in light gauge steel (LGS) buildings, a minimum life of 70–75 years is given for the buildings. It is about 50-55 years for prefabricated buildings. To use building in a healthy way, the maintenance has to be done periodically.   

QUESTION: How many days are the delivery times of light gauge steel (LGS) buildings.
ANSWER: Depending on the production schedule of an average 100m² single-storey building, the production takes around 20–25 days and the assembly process takes around 30–45 days.

QUESTION: How is the payment for light gauge steel (LGS) buildings?
ANSWER: Advance payment is necessary to start the production period. 40% cash is received to start work at the contract stage, and the remaining balance is collected at the production stage before loading. Documentary payment and term payment alternatives can be negotiated mutually.

QUESTION: With which vehicles can light gauge steel (LGS) or prefabricated buildings be transported?
ANSWER: Light gauge steel (LGS) or prefabricated structures can be transported by truck, DC or HC, ship, train or cargo plane.

QUESTION: Is there any shaking on the ground of the upper floors in multi–storey buildings?
ANSWER: Static calculations of light gauge steel (LGS) buildings are made according to certain standards and regulations (TS 648, TS 498, TS 11 372). Production takes place in line with these values. Therefore, there is a permissible amount of deflection in the intermediate floors. Intermediate section determinations are made by calculating an average of 250kg/m2 intermediate load in houses.

QUESTION: Can light gauge steel (LGS) or prefabricated structures be moved again after they are installed?
ANSWER: Light gauge steel (LGS) structures can be dismantled and moved to another place upon request. Since there will be disassembly assembly cost and 10% material deformation, additional material will be required. It is possible to make modifications in light gauge steel (LGS) or prefabricated buildings, if requested.

QUESTION: Do the materials used in light gauge steel (LGS) or prefabricated buildings have any harm to the environment and human health?
ANSWER: Light gauge steel (LGS) or prefabricated building materials do not contain any substances harmful to the environment and people. All materials used are produced in accordance with TSE/EN conditions.

QUESTION: Are light gauge steel (LGS) or prefabricated buildings earthquake resistant?
ANSWER: Light gauge steel (LGS) or prefabricated structures are produced considering the 1st degree earthquake zones. Since the building elements are connected to each other with screws and bolts, the collapse of the structure due to flexing during an earthquake is prevented.

QUESTION: Can I choose the paint colour of the light gauge steel (LGS) or prefabricated building myself? Or is there a fixed colour?
ANSWER: You can choose the colour you want from the paint chart we offer. 

QUESTION: How are light gauge steel (LGS) or prefabricated structures mounted on the ground?
ANSWER: Light gauge steel (LGS) or prefabricated structures are mounted on the concrete prepared by our customers with the help of steel dowels. Thus, the building is fixed to the ground concrete.

QUESTION: Where can I see the light gauge steel (LGS) and prefabricated sample buildings?
ANSWER: You may see light gauge steel (LGS) sample building at our factory located in Dilovası, Kocaeli, TR. You also may see prefabricated sample building at our showroom located in Esenyali–Pendik, Istanbul.

Steel And Prefabricated Building Disassembly And Assembly

Building Disassembly Details:

If there is a floor screed of the prefabricated building, it has to be broken and also if there is electrical, plumbing, heating and cooling system connections, they have to be broken and dismantled by owner before our team arrives. The transport and unloading of the disassembled building belongs to the employer.       

Lost materials of the dismantled building will be determined by our team, additional materials required for assembly will be notified to the employer, and additional costs of additional materials will be invoiced to the company, based on the employer's approval.

Building Dismantling Process Information:

* After dismantling, electrical cables and ducts, plumbing pipes and clean water piping will become unusable.
* During the disassembling of the structure, the base profiles will not be used as they remain under the screed concrete.
* Tiled panels in wet areas will need to be renewed in reassembly.
* Since ceiling coverings are sensitive materials, they may be broken while disassembling.

Building Assembly Details:

After the additional materials required for assembly are supplied, the assembly program will begin.
The rough assembly of the prefabricated building will be done by our team. Electrical, plumbing, heating and cooling installation and interior and exterior paint materials and application are not included in the assembly process.


WORKS INCLUDED IN OUR PRICES

* Providing the assembly team for disassembly on the date specified in the order,
* Disassembling of the steel or prefabricated building,
* Rough assembly of the prefabricated building after the missing materials are supplied from the manufacturer

WORKS NOT INCLUDED IN OUR PRICES

* Transportation and transport insurance of building material, equipment and team,
* Dismantling all kinds of external and internal line connections of the building to be dismantled (electricity, plumbing, telephone, heating, cooling installation), before the team arrives,
* Obtaining the necessary missing materials from the manufacturer and to pay transportation costs,
* Disassembly and assembly of indoor electrical installation materials and applications,
* Disassembly and assembly of indoor plumbing materials and applications
* Interior, exterior-ceiling, metal parts painting and priming process, siliconization of joint elements,
* Ground concrete (it must be disposed according to the plan given to you), all kinds of excavation and landscaping works,
* Obtaining the necessary plans, projects and legal permits for the establishment of the building,
* Accommodation and catering costs of the assembly team in assemblies outside of Istanbul.
* Ensuring the security of prefabricated building materials against theft at the construction site.
* Ensuring the security of prefabricated building assembly materials against theft at the construction site.
* Supply of scaffolding and crane if necessary,
* Supply of electrical energy to be used during the dismantling and assembly of steel or prefabricated buildings.
* Making all kinds of insulation materials and workmanship between the prefabricated building and the floor concrete,
* Heating and cooling installations (heater, combi boiler, water heater, air conditioner, etc.),
* Screed concrete application on the floor after the prefabricated building rough assembly,
* Floor and wet area wall coverings (ceramic, PVC, parquet, marble, etc.),
* Telephone, computer (data) and UPS installations and fittings,
* Fire installation and fixtures (smoke detector, fire extinguisher, alarm system, etc.),
* Electric main distribution panel (electric meter, switchboard, main fuse, etc.) and grounding line,
* Prefabricated building external connections (electricity, waste water, clean water, etc.),
* Standard kitchen cabinet, bathroom cabinets, mirror, soap dispenser, paper holder etc. accessories,
* Environmental cleaning of the construction site at the end of the work.

Advanteges of Steel and Prefabricated Buildings

Since most of the steel or prefabricated buildings are prepared in the factory environment, they have short construction periods.
The assembly times of the steel or prefabricated houses produced in the factory (for a single-storey house of 100m²) are completed in a short period of 3–4 days.


Since the prices of steel or prefabricated houses are certain, you can predict the cost of a house you want to have built in advance.


Since prefabricated houses are ready-made structures, they are more economical than conventional concrete houses in terms of both time and cost.


Steel houses and prefabricated houses, which are manufactured by making static calculations during the production phase, are resistant to earthquakes and natural disasters.


Steel houses and prefabricated houses can be added, expanded and moved to a different location if desired.


Steel buildings and Prefabricated buildings do not contain any chemicals that harm the environment during assembly. Steel and prefabricated buildings established in a short time do not cause visual and noise pollution.


Providing energy savings by placing solar energy panels on the roof of steel or prefabricated buildings also provides significant advantages.


Steel structures and prefabricated structures can be installed on-site at any time of the year.


Due to the high thermal insulation of the material used in steel or prefabricated buildings, provides heat efficiency.


Steel or Prefabricated buildings can be settled in the house immediately with the advantage of being assembled in a short time.
Steel or Prefabricated structures are not affected by snowy, rainy, windy and sunny weather as they are produced in accordance with four seasons climatic conditions.


Concrete is not used in steel or prefabricated buildings, except for ground concrete (basement foundation).


Since the wall thickness of steel or prefabricated buildings is thinner than concrete buildings, they take up less space and provide more usage area.


In steel or prefabricated buildings, it is possible to have the house you want with different exterior options other than standard materials.


All building elements used in the planning of steel or prefabricated buildings are produced in harmony with each other and no deviations or disruptions occur at the time of assembly.


Steel houses and Prefabricated houses produced using the latest technology provide a healthy and comfortable living space.
In steel or prefabricated buildings, personal projects can be made with interior and exterior options, if desired.


Steel or Prefabricated houses are produced as single storey and double storey. By offering different options in single-storey and double-storey models, modern structures specific to the environment can be made.


In steel or prefabricated buildings, projects other than standard buildings can be made by making special studies specific to disabled people.


In steel or prefabricated buildings, changes can be made in the pre-production plan.


Steel or Prefabricated structures can be dismantled and assembled elsewhere.


Steel or Prefabricated buildings are not only used as residences, but also sales offices, office buildings, dining halls, dormitories, social facilities, school buildings, hospitals, schools. It is used in many areas such as mosques, masjids, sports facilities, emergency disaster buildings, WC-shower buildings and construction site structures.


The average life of prefabricated buildings is 50-55 years, steel buildings is 70-75 years.
Since steel or prefabricated houses have very little wear and tear, their maintenance and renewal costs are low.
Due to the advantage of dismantling and transporting steel or prefabricated buildings later on, they can also be sold as second-hand if necessary.


You can get clearer information about steel houses or prefabricated houses by visiting our houses in our showroom and asking questions to our experienced staff.